Designing a scalable North American distribution network for a global apparel company
Executive Summary
A global apparel company was preparing for continued distribution growth while its existing facility was already more than 90% utilized. Its network handled multiple product flows across several facilities, and e-commerce fulfillment operated through a third-party logistics provider. Leaders needed to decide how much capacity to add, how to configure warehouse operations, and whether e-commerce should be insourced into the company’s network.
Miebach connected distribution center design, automation, and e-commerce network analysis to support those decisions. The recommended facility concept included a 200,000+-square-foot expansion and a phased automation roadmap. A separate e-commerce and returns scenario identified approximately $2+million in potential annual operating savings, while also quantifying a change in delivery coverage. The facility model projected lower staffing requirements and cumulative labor savings through 2040.
Rising Demand Met a Network with Limited Capacity
The global apparel company operated a multi-facility North American distribution network, and their facility utilization was already above 90%. The operation also faced aging material-handling infrastructure and rising distribution volumes. The 2040 throughput forecast was over 20 million units across operating pools.
The network supported distinct product and fulfillment requirements. Flat-packed goods, garments on hangers, shoes, wholesale distribution, e-commerce orders, and returns did not all use the same storage or handling processes. E-commerce fulfillment was outsourced, while wholesale operations used an existing company distribution center.
The company was also progressing with a distribution center expansion. The initial expansion study considered adding 100,000 to 150,000 square feet. As demand, throughput, and automation requirements were examined together, the preferred concept grew to a more than 200,000-square-foot expansion. The scale of that change made it important to understand the long-term staffing, capital, service, and operating implications before proceeding.
Leaders Had to Balance Fulfillment Cost, Delivery Speed, and Resilience
The executive decision involved more than simply adding warehouse space. Leaders needed to determine how the network should handle future volume and whether investment in automation and e-commerce consolidation would create enough value to justify the changes.
Keeping e-commerce at the third-party site preserved the existing fulfillment arrangement but also retained double handling and associated fulfillment costs. Moving e-commerce into the company’s own network could reduce those costs and use capacity planned for the expansion. However, the change would shift delivery coverage for some customers and increase reliance on a single facility.
The service question was especially relevant because customer delivery patterns varied by region. Most e-commerce orders used standard service, while expedited orders were more concentrated in California. The Northeast accounted for 30+% of standard deliveries and nearly 20% of expedited deliveries. For customers who did not pay for expedited service, a new shipping origin could affect delivery speed.
The company therefore needed an integrated view of the financial opportunity and its trade-offs: the cost of fulfillment, the delivery experience, the potential for facility disruption, and the ability to scale the network over time.
Network and Facility Analysis Connected Investment to Service Outcomes
Miebach established a common decision basis for the facility and network choices. The analysis used historical material flows, inventory, throughput, order volumes, and customer demand to define future storage, handling, and space requirements through the 15-year planning horizon.
Three facility consolidation and automation scenarios were evaluated. The comparison considered storage technologies, layouts, operating processes, capital investment, staffing, productivity, construction feasibility, and operating flexibility. The preferred concept was then refined to define material flows, automation, garment-on-hanger handling, functional areas, and IT integration requirements.
In parallel, the e-commerce analysis compared the current outsourced fulfillment arrangement with a scenario that moved e-commerce and returns into the company’s distribution network. Transportation costs and delivery performance were modeled using customer ZIP-code demand. The financial analysis considered warehouse and parcel costs, while the service analysis compared one-day, two-day, and longer standard delivery coverage.
The two workstreams allowed leadership to consider network and facility choices together. They provided a structured basis for comparing investment and labor requirements with operating savings, customer service effects, implementation considerations, resilience, and scalability.
Models Quantified Savings, Service Impacts, and Future Capacity
Financial performance: a quantified e-commerce consolidation scenario
The e-commerce and returns scenario projected total annual costs of $13+ million for the current arrangement and $10+ million for the modeled scenario, a difference of $2+ million per year. The model included warehouse, e-commerce and returns, transportation, and parcel costs across the United States, Canada, and Mexico.
The analysis used previous year volume assumptions of 1 million+ units and over 500,000 parcel deliveries, plus 120+ deliveries from the third-party site to the company’s distribution center. Transportation assumptions included a 55% parcel-rate discount for both locations, the same ratio of expedited shipments in both scenarios, and the same international zoning rates for Canada and Mexico.
Customer service: a different delivery profile
The modeled relocation changed the distribution of standard delivery times.
| Standard Delivery Time | Current Fulfillment Location | Modeled Network |
| 1 day | 35% | 7% |
| 2 days | 14% | 51% |
| 3 days | 21% | 15% |
| 4+ days | 31% | 28% |
Based on the rounded category shares, the model showed 9 percentage points more standard deliveries arriving within two days and 28 percentage points fewer arriving within one day. The change makes the customer-service consequence visible alongside the cost opportunity.
Operational performance: less double handling and a changed risk profile
The network scenario was designed to eliminate double handling at the third-party operation and associated handling rates that were considered uncompetitive. It also showed how incremental e-commerce volume could be absorbed into the planned distribution center expansion and identified fewer compliance issues than the current third-party arrangement.
The analysis also surfaced risks leaders would need to manage. Consolidating fulfillment would increase reliance on one facility, making the network more vulnerable to disruption. The service impact on customers who expect faster delivery would also need consideration. Comparisons included implementation effort, network complexity, delivery performance and compliance, resilience, environmental footprint, scalability, and flexibility.
Future scalability: a facility and automation roadmap
The preferred concept placed flat-packed goods in a goods-to-person system, reconfigured the existing building for garments on hangers, and kept shoe operations at a secondary facility. The design also defined IT integration requirements and a phased capacity roadmap for the automation system.
The facility model projected a 50+% reduction in staffing by 2040, excluding e-commerce. It estimated approximately $190 million in cumulative labor savings, with an indicated accuracy range of ±10%, and approximately $130 million in total capital expenditure.
Phased Roadmap Supports Future Capacity Decisions
The engagement gave the company a fact base for evaluating the distribution network as a connected system. Leaders could consider facility size, automation, e-commerce fulfillment, customer delivery coverage, staffing, investment, and resilience within the same decision process.
The resulting concept and models also created a basis for future planning. The phased automation roadmap gives the company a way to stage capacity against forecast demand, while the cost and service models provide a reference for revisiting network assumptions as volumes, customer expectations, and operating requirements change.